|
|
In the framework of extending the Athens Metro from Sepolia to Peristeri, OBERMEYER
undertook the general final tender design for
the 'Agios Antonios' station in Peristeri, comprising
architectural design, bearing structure design and technical
equipment design.
The main design parameters of this
challenging project were the introduction of natural
light in the underground station and the neighbouring
of the station with 20-storey buildings. The €15 million
project is already completed and was in operation during
the 2004 Athens Olympic Games.
|
|